Phase I project list

Shortlist of Phase I projects that have been identified:

  • Rewire Hobbs Meter – insertion of ignition key should not activate elapsed time, only running engine (complete)
  • Replace raw water pump (complete)
  • Re-engineer access to gearbox dipstick and filler (complete)
  • Fix Morse throttle cable control in binnacle (complete)
  • Remove redundant wiring (partially complete)
  • Replace fire extinguishers/relabel (complete)
  • Service all through-hull fittings (complete)
  • Replace bilge pump switch and 2,000 gallon per hr pump (complete)
  • Powerwash all interior surfaces and bilge areas (complete)
  • Label all 12V and AC circuits, replace terminals and renew most wiring runs (In progress)
  • Replace all fuses in runs with central fuse block in accessible area (In progress)
  • Reduce 110AC wiring on-board to absolute minimum (In progress)
  • Remove redundant plumbing (all copper lines) (complete)
  • Remove and replace holding tank with new polypropelene  (complete)
  • Replace macerator, Y-valve and all waste plumbing   (complete)
  • Relocate fuel kill-switch to companionwaarea (complete)
  • Remove decks and coring, replace, reglass, and new anti-slip (complete)
  • Remove chainplates and replace with new 316L stainless steel (complete)
  • Replace fenders and dock-lines (complete)
  • Replace running rigging (partial completion)
  • Shorten boom 22″, re-cut mainsail  (complete)
  • Sail maintenance – clean and restitch where needed, new leach-lines   (complete)
  • Remove glass from all hatches, route frames, varnish frames and rebed glass (complete) 
  • Strip all exterior brightwork, bleach, revarnish 7 coats Miniwax Helmsman UV (cockpit complete) 
  • Resurface teak cockpit seating, new teak plugs where required
  • Install additional cockpit scuppers
  • Remove wooden storage box from foredeck (complete)
  • Relocate propane tanks from foredeck to aft pinked deck, replace lines (complete)
  • Reroute monitor steering system control lines (complete)
  • Replace bladder holding tank with 1/2″ poly tank (complete)
  • Replace all waste hoses, install breathers, new macerator, Y-valves (complete)
  • Replace all remaining copper potable water lines with pex and HP hose (complete)
  • Replace clear panels on dodger
  • Replace all exterior canvas work, sail covers etc
  • Replace GPS and radar with updated units
  • Remodel chart-table  (complete)
  • Clean potable water tanks  (complete)
  • Scrub diesel and clean tanks  (complete)
  • Remove diesel engine – major overhaul  (complete)
  • Replace batteries
  • Remove and replace all Formica counter-tops with Marmoleum  (complete)
  • Strip interior woodwork, bleach several shades lighter and surface with clear varnish  (complete)
  • Replace bulbs with LED and replace most light fixtures  (complete)
  • Replace galley sink with double deep bowls  (complete)
  • Replace head sink-fixtures (complete)
  • Paint/reline closets and lockers with insulation (partial completion)
  • Resurface headliners in fwd and aft double cabins  (complete)
  • Recover/reupholster cushions  (complete)
  • Replace foam in sleeping areas and recover  (complete)