Category: Electrical
Our stay at Newcastle Island came to an end on a really high note. Tony finished the Spectra 150 watermaker installation and we filled our tanks for the first time without a hose! I don’t think that I have ever seen Tony so excited! We can produce 6 gallons/hour through reverse osmosis without starting the […]
Tony and Karin purchased Arabella (now renamed Mayaluga) in Seattle July 2013 without any illusions as to her condition. We knew she was definitely a fixer-upper that needed a lot more than simple TLC. We felt that her honest construction and good reviews as an offshore cruiser made it a worthwhile project. Three prior owners […]
Shortlist of Phase I projects that have been identified: Rewire Hobbs Meter – insertion of ignition key should not activate elapsed time, only running engine (complete) Replace raw water pump (complete) Re-engineer access to gearbox dipstick and filler (complete) Fix Morse throttle cable control in binnacle (complete) Remove redundant wiring (partially complete) Replace fire extinguishers/relabel (complete) Service all through-hull fittings (complete) […]
As August comes to a close, we are now frantically reassembling all essential stuff so that we can at least get away and be independent of shore for 10 days. The lovely, shiny rebuilt engine is back “in the hole” rewired and replumbed. The diesel purrs like a satisfied kitten! Meticulous shaft alignment has […]
so …….. this is what the “full sized” chart table looked like before we started. The problem was two-fold: Firstly, the radar arm was bolted through the surface of the chart table. Secondly, the VHF radio mounting bracket was screwed down onto the rear section of the chart table. The net result was that […]
Recent Comments