Category: Galley

Water and mast steps……..check!

Our stay at Newcastle Island came to an end on a really high note.  Tony finished the Spectra 150 watermaker installation and we filled our tanks for the first time without a hose!  I don’t think that I have ever seen Tony so excited!  We can produce 6 gallons/hour through reverse osmosis without starting the […]

Phase I project list

Shortlist of Phase I projects that have been identified: Rewire Hobbs Meter – insertion of ignition key should not activate elapsed time, only running engine (complete) Replace raw water pump (complete) Re-engineer access to gearbox dipstick and filler (complete) Fix Morse throttle cable control in binnacle (complete) Remove redundant wiring (partially complete) Replace fire extinguishers/relabel (complete) Service all through-hull fittings (complete) […]

Shakedown Cruise

As August comes to a close, we are now frantically reassembling all essential stuff so that we can at least get away and be independent of shore for 10 days.  The lovely, shiny rebuilt engine is back “in the hole” rewired and replumbed.  The diesel purrs like a satisfied kitten!   Meticulous shaft alignment has […]

New countertops made from linseeds!

Tony and I installed our first new countertop today – in the galley.  We hashed about a number of ideas on what material we should use and ultimately decided on Marmoleum. One of the considerations Tony and I have in making decisions about products we use on Arabella is their impact on the environment and […]